Rufineer v0.43.0
Account
Browse the docs

Mapped against the library

Coverage

How the planned language handles the model families in the More Models library: 741 workbooks across twelve sectors and twenty structuring topics.

868files in More Models
741Excel workbooks
232workbooks scanned, up to two per folder
2,838sheets read for labels and structure

The library covers twelve sectors and twenty structuring topics, from simple training exercises to lender and bid models. Every family below was checked against Rufineer. Where something could not be written cleanly, the language was extended; those rows say v0.5.

By sector

FamilySeen in the libraryWhat the models doRufineerSince
Solar and windA. Solar Models (41), B. Wind Models (21), Purchase Evaluate, Solar LCOEP50 with an uncertainty, degradation, monthly seasonality, inverter replacement, merchant tails, parallel P50/P99 modelspvalue, seasonal, level, underv0.2–0.4
HydroF. Hydro Models (7)Hydrology by year, tariff tables, flexible debt structuringtables by year, DSCR profiles, repayment profilesv0.2
Thermal, IPP and merchantC. IPP and Thermal (16), K. Commodity and Merchant (5), GE A-Z (16)Heat rate and its degradation, fuel prices, spark spreads, capacity and energy charges, forced outages, overhauls by running hours, sale at exitbands, | every N of line, pv_ahead, underv0.5
Biomass, biogas and wasteG. Biomass (53)Feedstock tonnes, RIN and LCFS credit prices, plant roll-outstables, stages, groupsv0.4
Upstream oil and gasD. Upstream Oil (33)Production curves, cost-recovery pools, profit oil by sliding scale or R-factor, royalties, milestone bonuses, hedging, reserve-based lending, abandonment.available, bands, tiered, event, pv_ahead, | sampled, hedgev0.5
PPP and infrastructureD. Infrastructure – PPP (20), Malaysia Toll Road (14), Toll Road and Transport casesMonthly operations with six-monthly financing, availability payments, value for money, bid tariff at a target IRR, lifecycle reserves, grants, adaptation vs business-as-usualrulers, seek, under, grants in fundingv0.5
ShippingL. Shipping (6), Australian Shipping (6), Ocean RigsCharter days, dry-dock days by age, charter rates with a lag, tonnage tax, returns in USD and PKRoverlap, | lag, bands, inv0.5
Portfolios of small assetsE. Consolidating Separate Projects (21): telecom towers, rooftop solar, battery leases, energy efficiencyA project database, one template sheet per asset, include flags, consolidation, holding-company taxmodule site[p] for p in … where …, sum(site[*].x)v0.5
Nuclear and technology LCOEI. Nuclear, Z. EDF Files (17)Capital recovery factors, LCOE by technologylevel, lcoe, functionv0.4
Corporate and real estateInterview exams: hotel, private equity, corporateMonthly P&L and balance sheet, LBO returnsstatements, balancesv0.1 (partial)

By structure

FamilySeen in the libraryWhat the models doRufineerSince
Debt sizing and biddingC. Section 1, B. Debt Sizing ExercisesLower of gearing and DSCR, bid price at a target IRR, development fee as a share of costmin, seek, gross_upv0.4–0.5
Funding during constructionC. Section 2 (12)Equity first or pro rata, equity bridge loans, IDC and fee loops, DSRA pre-fundingfunding first … then, solve, equity_bridge_loanv0.4–0.5
Repayment and sculptingC. Section 3 (16), Sculpting Course (11), Curved SculptingSculpting, changing DSCR, level repayment, balloon, bullet, negative cash flow yearsrepayment profiles, DSCR series, clampv0.5
Multiple debt issuesC. Section 13, Consolidated Debt Issues (6)Tranches with their own terms, LLCR-based allocationfor t in tranches, pv_aheadv0.4–0.5
Credit enhancementsC. Section 5 (9)DSRA, MRA with changing periods, cash sweeps, letters of creditreserve, when, waterfallv0.2–0.4
Refinancing and mini-permsC. Section 9 (7)Refinancing on a date, sweeps, repricing, balloon take-outrefinance, balloonv0.5
Cover ratios and creditC. Section 10 (6), Debt Default and Debt IRRLLCR, PLCR, default and recoverypv_aheadv0.5
Circular referencesD. Circular References (109)Copy-paste macros, VBA functions, parallel models, goal seek, data tablessolve … by paste | function | algebra, under, seek, resultsv0.5
Tax equityF. Tax Equity Structures (63)Partnership and yield flips, capital accounts, DRO, minimum gain, ITC and PTC, MACRS and bonus, back leverage, sale-leaseback, inverted lease, transferabilitysplit … among, event flip, capital_account, leasev0.5
Bonds and securitisationConsolidated Debt Issues, Bond Financing Case, Daily BondNotes over a pool of loans, price, yield, WAL, prepayment penalties, servicing fees, daily accrualbond, portfolio, step dayv0.5
TimingTiming Issues, Monthly Cash Waterfall, Monthly Accumulation, Actual and ForecastMid-period COD, half-year and quarter ends, monthly to annual roll-ups, actuals.share, rulers, | actualsv0.4–0.5
Development and riskC. Section 14 (9), Development Probability, Value for MoneyStage probabilities, simulations, probability-weighted value, public sector comparatorresults … weighted, underv0.5 (Monte Carlo open)
Terminal value and optionsC. Section 8Contract extensions, choosing the best strategy at the end of a PPApv_ahead, max across under casesv0.5 (partial)
Working capital and lossesJ. NOL Analysis (6), Working CapitalReceivables and payables, losses with expiry and limitsworking_capital, tax_lossesv0.2

Not covered yet

  • Hour-by-hour battery dispatch that chooses when to charge. Rufineer reduces 8,760-hour profiles to monthly or yearly factors; dispatch itself stays outside the model.
  • Monte Carlo with thousands of runs. results handles tens of cases; larger runs are an open decision.
  • Macros that pick the best strategy in each period (real options). Rufineer can compare whole strategies with under, not re-choose period by period.
  • Hotel and corporate operating detail (room nights, segments, comparables). The building blocks work, but there is no library support.

A note on method

The library's own Modelling Philosophy deck argues for mathematics over copy-paste macros, key drivers you can see (USD/kW-year, yield, performance ratio, the standard deviation behind P90), few functions, and more checks. Rufineer takes the same line. by algebra and the closed forms in the standard library come first. by function suits a live model. by paste stays the default for FAST lender models.